top of page

PROJECT :

Seismic study and analysis

Amador Cruise Terminal

​

CLIENT: China Harbor Engineering Company (CHEC)

​

SCOPE: This project consisted of the Management and Development of a seismic analysis of the steel structures that make up the new Amador cruise terminal. The required analysis sought the possibility of reducing the weight of the pre-designed structure through the use of steel of Chinese origin, instead of North American.

​

LOCATION: Perico Island, Amador Causeway, Panama City .

​

VALUE: CLP$ 56,250,000

​

TIME FRAME: September 2018 to January 2019

logo BC8 TRANSP.png
bottom of page