top of page

PROJECT :
Seismic study and analysis
Amador Cruise Terminal
CLIENT: China Harbor Engineering Company (CHEC)
SCOPE: This project consisted of the Management and Development of a seismic analysis of the steel structures that make up the new Amador cruise terminal. The required analysis sought the possibility of reducing the weight of the pre-designed structure through the use of steel of Chinese origin, instead of North American.
LOCATION: Perico Island, Amador Causeway, Panama City .
VALUE: CLP$ 56,250,000
TIME FRAME: September 2018 to January 2019
bottom of page



