PROJECT:
Integral Improvement of Gas Capture
and Processing, Potrerillos Smelter
CLIENT : Outotec Chile
SCOPE: The engineering project considered the design, at detail engineering level, of the reinforcement of the CPS pipeline support structure and foundations, pipeline support structures, pipe racks (of different magnitudes), retaining walls, electrical rooms and vibrating equipment foundations.
LOCATION: Diego de Almagro, Atacama Region, Chile.
VALUE: CLP$116,424,000
TIME FRAME: September 2016 to February 2018